Size: 3.7 Acres
In 2016, the south shore of Lake Bemidji was restored to its native state for the first time in a century, improving the shoreline, water quality and aquatic habitat issues in an urban-recreational setting.
After a century of industrial use, this project brought Lake Bemidji’s South Shore to its original state removing 1,144 tons of contaminated soil and sediment, 9,400 cubic yards of woody debris from the lake-bottom and planted native vegetation on the shoreline to restore and enhance aquatic habitat.
The project totaled 3.7 acres, where 3.1 acres was replanted with native vegetation, improving water quality and habitat in the lake and 0.6 acre was restored back for use by the public as a swimming beach, rest stop along the bike trail, and education area, restoring this area for ecological and public use.
Anderson’s civil engineers, landscape architects and environmental specialists worked closely with the City of Bemidji and the Minnesota DNR to meet their expectations in this high-use pedestrian- oriented area.
After a century of industrial use, this project brought Lake Bemidji’s South Shore to its original state removing 1,144 tons of contaminated soil and sediment, 9,400 cubic yards of woody debris from the lake-bottom and planted native vegetation on the shoreline to restore and enhance aquatic habitat.
The project totaled 3.7 acres, where 3.1 acres was replanted with native vegetation, improving water quality and habitat in the lake and 0.6 acre was restored back for use by the public as a swimming beach, rest stop along the bike trail, and education area, restoring this area for ecological and public use.
“Anderson’s civil engineers, landscape architects, and environmental specialists worked closely with the City of Bemidji and the Minnesota DNR to meet their expectations in this high-use pedestrian oriented area.”
-Director of Public Works / City Engineer, City of Bemidji
- Size: 3.7 Acres